作业帮 > 英语 > 作业

英语翻译Mobile Assembly/Y Ball SocketsAim To change the Y ball s

来源:学生作业帮 编辑:百度作业网作业帮 分类:英语作业 时间:2024/04/29 07:47:58
英语翻译
Mobile Assembly/Y Ball Sockets
Aim To change the Y ball sockets
Tools Standard tools – normal thread locking material - Grease G2
Initial state The equipment is switched off (in particular by opening the circuit breaker above it on the electrical line)
Reassembly procedure
1.Slide the 4 linear bearings off the ends of the upper and lower Y rails taking care with the direction:Immobilization holes turned backwards by the lubricator for the upper rail and downwards for the lower rail.
2.Replace the 8 lubricators (2).
3.Replace the bearing stop screws with their flat washers (1).
4.Replace the 4 end stops on the ends of the Y rails.
Grease with the G2 (blue syringe)
英语翻译Mobile Assembly/Y Ball SocketsAim To change the Y ball s
★专业人工翻译:
非固定配合/ Y形球套座
目标:改变Y形球套座
工具:标准工具-普通螺纹锁定材料-G2型油脂
初始状态:该设备是被切断的(用电源线上面特殊的断路器断开)
重新装配的程序:
1.滑动4个线性轴承小心地使Y形侨板沿着下面所说的方向将上下段分开:
在上下导轨上加润滑油,反向旋转固定孔.
2.放回8个防喷管(2).
3.用各自的平面垫圈(1)放置轴承止动螺丝.
4.在Y形侨板的各端放置4个限位挡板.
油脂:用G2型润滑油(蓝色注射器)